Project Documents:
Decomp Physical Model
Environmental Assessment (EA) & Design Test Documentation Report (DTDR)
Final - April 2010



Draft PIR icon


The Final Decomp Physical Model Environmental Assessment (EA) & Design Test Documentation Report (DTDR) is available.





Download the Final EA/DTDR

4 Jun 2010 - The Final Decomp Physical Model Environmental Assessment (EA) & Design Test Documentation Report (DTDR)

The report is available for download as a complete file or by section.

View or download the complete report (17 mb, PDF)
*please note large file size.


Download by section:

 

Project Contact:

Stephen Baisden
U.S. Army Corps of Engineers
Stephen.A.Baisden@usace.army.mil



Related Links:

Decomp Physical Model overview page
Water Conservation Area 3 Decomp project page