CERP Project:
Flows to Northwest (NW) and Central Water
Conservation Areas (WCA) 3A



The purpose of this feature is to increase environmental water supply availability, increase depths and extend wetland hydropatterns in the northwest corner and west-central portions of Water Conservation Area 3A. If additional water quality treatment is determined to be required as a result of future detailed planning and design work, existing facilities would be modified to provide the necessary treatment.

Water quality treatment of flows is assumed to be provided by the Florida Everglades Construction Project and water quality treatment strategies developed to fulfill the Non-Everglades Construction Project requirements of the Everglades Forever Act.


Project Details:

Project Sponsor:

South Florida Water Management District

Project Schedule:

For scheduling information regarding this project, please see the Master Implementation Sequencing Plan (MISP).

Project Phase:

Pre-Construction, Engineering and Design

Design Agreement:

12 May 2000

CERP Component Designation:

II, RR

Project Cooperation Agreement:

 

Authorization:

WRDA 2000 (Programmatic Authority)

 

Project Contacts:

Michael Collis
U.S. Army Corps of Engineers
michael.j.collis@usace.army.mil

John Shaffer
South Florida Water Management District
jshaffe@sfwmd.gov