CERP Project:
Modify Holey Land Wildlife Management Area
Operation Plan



Several operational components were recommended after evaluation on a regional scale using the South Florida Water Management Model, to analyze regional hydrologic effects. Water deliveries are made to Holey Land from the Rotenberger Wildlife Management Area or from Stormwater Treatment Area 3/4 if Rotenberger flows are insufficient. The deliveries are assumed to be of acceptable water quality. Modification to the current operating plan and rules for Holey Land Wildlife Management Area will be made to implement rain-driven operations for this area to improve the timing and location of water depths within this wildlife management area.

More detailed planning will be necessary to develop the optimum modifications to the C&SF project. Costs to implement these features were not estimated. Most measures will be implemented in association with related construction features and it is assumed costs will be borne by the appropriate affected utilities.


Project Details:

Project Sponsor:

South Florida Water Management District

Project Schedule:

For scheduling information regarding this project, please see the Master Implementation Sequencing Plan (MISP).

Project Phase:

Planning; Modifications as needed

Design Agreement:

12 May 2000

CERP Component Designation:

DD

Project Cooperation Agreement:

 

Authorization:

Not required. Implement under existing state process.