CERP Project:
Modify Rotenberger Wildlife Management Area
Operation Plan



Several operational components were recommended after evaluation on a regional scale using the South Florida Water Management Model, to analyze regional hydrologic effects. These new operational rules are intended to improve the timing and location of water depths within the Rotenberger Wildlife Management Area. Modification to the current operating plan for the Rotenberger Wildlife Management Area will be made to implement rain-driven operations for this area as needed. Water deliveries are made to the Rotenberger Area from Stormwater Treatment Area 5. The deliveries are assumed to be of acceptable water quality.

More detailed planning will be necessary to develop the optimum modifications to the C&SF project. Costs to implement these features were not estimated. Most measures will be implemented in association with related construction features and it is assumed costs will be borne by the appropriate affected utilities.


Project Details:

Project Sponsor:

South Florida Water Management District

Project Schedule:

For scheduling information regarding this project, please see the Master Implementation Sequencing Plan (MISP).

Project Phase:

Planning; Modifications as needed

Design Agreement:

12 May 2000

CERP Component Designation:

EE

Project Cooperation Agreement:

 

Authorization:

Not required. Implement under existing state process.