CERP Project:
Central Lake Belt Storage Area



The purpose of the feature is to store excess water from Water Conservation Areas 2 and 3 and to provide environmental water supply deliveries to: (1) Northeast Shark River Slough, (2) Water Conservation Area 3B, and (3) to Biscayne Bay, in that order, if available. It is assumed that water diverted from WCAs 2 and 3 is of adequate quality to return to the Everglades Protection Area and Biscayne Bay. Final configurations and treatment requirements were to come from a Water Preserve Areas Feasibility Study. Though drafted, the study scope became too large, so projects are being revisited separately.


Project Details:

Project Sponsor:

South Florida Water Management District

Project Schedule:

For scheduling information regarding this project, please see the Master Implementation Sequencing Plan (MISP).

Project Phase:

Pre-Construction, Engineering and Design

Design Agreement:

12 May 2000

CERP Component Designation:

S (Part 1 and 2), EEE

Project Cooperation Agreement:

 

Authorization:

Not currently authorized

 

Project Contacts:

Michael Collis
U.S. Army Corps of Engineers
michael.j.collis@usace.army.mil